Insights and updates from the Kingsway Builders team
Building Code
March 13, 2026
Climate Zone 7B in Alberta demands high-performance wall assemblies. Explore NBC-mandated minimum effective R-values and advanced construction strategies for compliance.
Read Article →
Building Code
March 12, 2026
Lumber wall sheathing must have all ends supported, and fastener spacing is dictated by specific material and load considerations. Detailed fastener spacing is crucial to wall integrity and compliance under the NBC.
Read Article →
Building Code
March 12, 2026
Fourplex construction is reshaping Calgary’s multifamily housing market in 2026, driven by top builders, strategic zoning, and evolving investment economics. Insights into leading projects, regulations, and design are defining the city’s new urban landscape.
Read Article →
Building Code
March 11, 2026
NBC(AE) 9.9.10.1.(1)(a)(ii) imposes clear and detailed requirements on egress window size and function. Every multifamily project in Alberta hinges on strict adherence for safe occupancy and legal conformity.
Read Article →
Building Code
March 8, 2026
The Alberta Building Code specifies criteria for under-slab insulation thickness, impacting energy efficiency, durability, and code compliance for multifamily and mixed-use projects. Key R-value requirements and calculation strategies for Alberta projects.
Read Article →
Building Code
March 7, 2026
NBC 9.23.4.9.(1) prescribes strict joist hanger criteria for wood-frame assemblies in Alberta’s demanding climate. Optimizing for load, span, nailing, and bearing is essential for long-term performance.
Read Article →
Building Code
March 5, 2026
NBC 9.15.3.8.(1) demands that exterior wall concrete footings in Alberta be at least 100 mm thick-or as thick as the footing’s projection. Robust footing design is critical under Alberta’s challenging soil and load conditions.
Read Article →
Building Code
March 5, 2026
Alberta allows walls to deviate up to 1 inch in 8 feet for plumbness before triggering warranty violations. Precise measurement and documentation are essential to risk management.
Read Article →
Building Code
March 4, 2026
Under the Alberta Building Code, landings at the top of interior stairways must meet strict dimensional rules. Code-aligned design and field execution are key for safety and compliance.
Read Article →
Building Code
March 4, 2026
Bedroom egress windows in Alberta must meet strict NBC(AE) 2019 requirements. Key dimensions, hardware, window wells, and compliance challenges are detailed here.
Read Article →
Building Code
March 4, 2026
While Alberta’s standards reference the NBC and ARCA, there is no minimum shingle thickness defined, but CSA A123.5 certification is mandatory. Strict adherence to performance and installation requirements is essential for multifamily durability.
Read Article →
Building Code
March 4, 2026
Determining minimum lintel sizes in Alberta’s NBC demands careful use of tributary width, loading, and code tables. Ensure code compliance and structural integrity in multifamily projects.
Read Article →
Building Code
March 4, 2026
Heated garages in Alberta require concrete slabs-on-ground with a minimum thickness of 100 mm per NBC 9.15.4.3.(1), but regional soil and climate conditions demand additional measures for lasting performance.
Read Article →
Building Code
March 2, 2026
The Alberta Building Code 2024 establishes effective basement wall insulation requirements in Climate Zone 7A, mandating minimum R-values for both below-grade and above-grade portions. Explore technical, design, and compliance implications for large-scale multifamily construction in Calgary and Edmonton.
Read Article →
Building Code
March 2, 2026
The 2023 Alberta Building Code introduces stricter braced wall panel standards, alongside rapid prefab adoption and acute tariff and labour challenges. Strategic compliance and innovation are essential.
Read Article →
Building Code
March 1, 2026
Section 9.18.2.1 of NBC(AE) 2023 mandates minimum crawl space access sizes. Deep practical analysis of design, compliance, and construction implications.
Read Article →Get a cost estimate or schedule a consultation with our team.